Nesher Cement Case Study – 150 ton Gypsum Feed-bin
a modern 5 mta capacity cement plant. www.nesher.co.il
Before Silo-Flow™ • 6 air-cannons per bin
• Flow stoppages 2-5 times per shift
• Mixture of synthetic and natural gypsum
• Erratic feeding process
• Frequent cement production stoppages
After Silo-Flow™ • 1 Silo-Flow Device per bin
• No stoppages since Silo-Flow installation
• 100% synthetic gypsum (much cheaper)
• Smooth gypsum feeding process
• No cement production stoppage